Friday, December 5, 2008
MP 2 Log 12/5
Today I worked on fixing my elevational and 3D drawings. I gave my drawings to my teacher for feedback before final submission. I needed to fix things and both my elevational and 3D drawings such as dimensions, colors, and missing walls. I plan on fixing these within the next few days.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment